Revenue Search: Inside Bittensor

Subnet Session with Josh from Green Compute: Subnet 110

25 snips
Apr 22, 2026
A deep dive into turning stranded renewable power on farms into reliable AI compute clusters. They discuss building enterprise-grade, symmetric GPU deployments with human sales and engineering support. Topics include gating miners by technical and green-power standards, fiat-to-token onboarding strategies, and real-world deployments like biogas-powered pig farm compute hubs.
Ask episode
AI Snips
Chapters
Transcript
Episode notes
INSIGHT

Subnet Backed By An Existing Profitable Compute Business

  • Green Compute plugs a new subnet into an already-profitable hardware business, avoiding runway pressure from token sales.
  • Existing contracts, multi-million assets under management and sales pipeline accelerate subnet growth without immediate alpha fundraising.
INSIGHT

Turning Stranded Renewable Power Into AI Compute

  • Green Compute turns stranded renewable energy into AI compute by colocating servers at sites that otherwise dump excess power.
  • Josh already operates on 50+ UK renewable sites, turning wasted solar, wind, hydro and anaerobic digestion power into profitable on-site compute contracts.
INSIGHT

Use Consumer GPUs For Cost-Effective Inference

  • Inference workloads often perform best on high-end consumer GPUs like 4090/5090 for token throughput per cost.
  • Josh focuses on inference (not large-scale training) and builds symmetric, enterprise-grade clusters from consumer GPUs to maximize commercial efficiency.
Get the Snipd Podcast app to discover more snips from this episode
Get the app