Elevate Construction Ep.226 - Design Flow into Your Project First!
Jason pleads to create takt plan in proposal phase schematic design before CPM. Company hit rate went from 66% on time to 89% rising by implementing takt planning. Snagit tool for superintendents, hit print screen send snippets to trade partners. Daughter had horrible experience with mean people, stayed above line, Jason proud she was present with emotions didn't run away. CPM metrics showed problem but recovered with takt planning not CPM. Single biggest thing to win and not crash land is begin with takt plan, right overall duration flow set up manpower material counts reduce.
What you'll learn in this episode:
- Create takt plan first: Proposal phase schematic design before CPM schedule
- Company results: Hit rate went 66% on time to 89% rising with takt planning
- Snagit tool: Hit print screen, send snippets to trade partners, add arrows hatching highlights
- Being present difficult situations: Daughter stayed above line, present with emotions, rewarded outside comfort zone
- CPM metrics versus recovery: Metrics showed problem, recovered with takt not CPM methodologies
- Challenge: Read The Goal, Last Planner, Scrum, Takt Planning for full scheduling spectrum
Single biggest thing to win not crash land is begin with takt plan, right duration flow manpower material counts.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw