Get It Right with Undercover Architect

New Build Update: From Lock Up to Handover and Moving In, with Michael

Mar 9, 2026
A multi-year new build journey reaches handover and first months of living in a pavilion-style home. They cover the logistics between lock up and completion, trade scheduling headaches like a long tiling delay, and coordination of finishes. DIY landscaping on a sloping block, reusing site soil, and when to bring in a landscape designer are explored. Small living-in adjustments around lighting and services also come up.
Ask episode
AI Snips
Chapters
Transcript
Episode notes
ANECDOTE

Surreal Satisfaction At Handover

  • Michael felt surreal satisfaction at handover and let his wife gradually settle the home rather than rush the process.
  • The builder returned after handover to hang paintings and fix door handles, showing a collaborative finish-to-occupancy approach.
ADVICE

Stage Landscaping After Paving

  • Do leave soft landscaping until after the builder finishes hard paving so levels and drainage meet the building's finished edges.
  • Michael had the builder install paving and irrigation, then brought in topsoil and natives to cover compaction sand.
INSIGHT

Work With Topography To Reuse Soil

  • Reuse excavated material on a sloping site to minimise carting soil off and bringing soil back in for landscaping.
  • Michael pushed excavated sand and stone to form a level east-side lawn and will reuse larger stones for a sloping rock wall.
Get the Snipd Podcast app to discover more snips from this episode
Get the app