Bitcoin Audible

Chat_161 - Bitcoin is Tangible with Cade Peterson

13 snips
Feb 19, 2026
Cade Peterson, Air Force vet and founder of Softwarm LLC who builds immersion Bitcoin-mining heat systems. He walks through turning banks, concrete plants and homes into heat-producing mines. Short takes cover immersion plumbing, tax and economic angles, grid-curtailment and stranded-energy uses. Hands-on philosophy and practical tips for builders round out the conversation.
Ask episode
AI Snips
Chapters
Transcript
Episode notes
ADVICE

Offer Hash-Split Deals To Get Adoption

  • Find a partner who supplies power and offer a hash-split deal to install miners with minimal upfront cost to them.
  • Structure splits so the owner recovers cost first, then transfers ownership or keeps the ongoing rewards.
ANECDOTE

Concrete Plant Replaced Propane With Miners

  • Cade hooked immersion tanks to a local concrete plant's 2,500-gallon water heater, replacing costly propane with Bitcoin-mined heat.
  • The plant now runs multiple S21 miners and saved substantial fuel costs while keeping full cost recovery in Bitcoin.
ADVICE

Use Immersion Tanks And HVAC Parts

  • Do prefer immersion tanks for home and business heat integration because they bolt into HVAC plumbing and simplify upgrades.
  • Do use off-the-shelf HVAC parts and thermostats to regulate pumps and heat dumps instead of custom firmware when possible.
Get the Snipd Podcast app to discover more snips from this episode
Get the app