Elevate Construction cover image

Ep.270 - Limiting Work in Progress - Flow Series

Elevate Construction

00:00

How to Reduce Throughput Time in a Process

You can bring out that paving contractor in segments All you have to do is tell them in the in pre-construction I mean so that is my answer to super saying oh no, I got to bring them all out at once. The throughput time really speaks to how long it takes to get through a process and we want to reduce that as much as possible.

Play episode from 19:21
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app