Elevate Construction cover image

Ep.349 - The Takt Production System - Part 13

Elevate Construction

00:00

Tact Is the Only Scheduling System That Occurs the Law of Bottlenecks

The law of variation is defined as the difference between an ideal and an actual situation. A cpum sequence is so chaotic it is difficult to see problems within the system. As variation increases through through put times or duration, then the project in date will extend. This means that we must see and prevent road blocks in create standards and consistency. Tact takes one twelfth of the time to manage as a scheduling system,. So the team's main focus can be on king work ready and preventing road blocks.

Play episode from 06:22
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app