Elevate Construction cover image

Ep.313 - The Simplest & Best Way to Schedule!

Elevate Construction

00:00

How to Optimize Your Tax Sequence

The genius of the system that we're going to talk about on the podcast is that this, the tacked wagon might be labeled overhead mechanical, but the work package is overhead mechanical. This has work steps in it. And so what we now have are a list of things that need to be done in the right week. So you don't really have flow in a pull plan until you compare the pull plans by areas together. That's when you start to see those three dimensions, the workflow, the trade flow, and logistical flow.

Play episode from 13:19
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app