Ep.338 - The Takt Production System - Part 2

Elevate Construction

00:00

The CPM Schedule Is a Tact System Prone to Quality Mistakes

The problem is that c p m lacks transparency. Even though the hidden logic, calendars and other functions can all be shown in one way or another, it is difficult to report and analyze these on an ongoing basis. There is so much concealed within a sepium schedule that other systems are needed for quality control. In arrs, it can take up to seven different applications to properly run a c p m schedule. Tact is the only system that will show the team why and where to focus to recover. You will never recover a schedule without regaining flow. And therefore, you will never properly recover a scheduleWithout tact ok, everybody. That's our second section for the tax production system.

Play episode from 20:35
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app