Elevate Construction cover image

Ep.338 - The Takt Production System - Part 2

Elevate Construction

00:00

CPM Scheduling Is a Shot in the Dark

C p m masquerades as a good plan when all it actually shows is a ton of detailed guessing. Tact is a shot with data and visibility that even the most inexperienced label laborer can read. The fourth major problem with c p m is that it has too much unchecked power.

Play episode from 13:06
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app