Elevate Construction cover image

Ep.346 - The Takt Production System - Part 10

Elevate Construction

00:00

Flow Is a Priority in Construction

Flow enables the very long supply chains on which we rely in construction by holding to consistent dates. Scrum and last planner system also advocate flow, but are not able to maintain it fully when based on a c p m system of milestones. Tact is the best companion to these systems because it can properly identify ke milestones within a flowable system. The effect that waste variation of road blocks have on the production in the field are widely recognized and accepted.

Play episode from 05:32
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app