Energy Gang cover image

A solution to the problem of paying for data centre power? Unpacking AWS’s recent 3 gigawatt deal with NIPSCO

Energy Gang

00:00

Why grid connection was chosen over behind‑the‑meter

Brandon says grid connection is cost‑effective and spreads fixed costs, strengthening system reliability.

Play episode from 33:27
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app