Flow Efficiency and Resource Efficiency in Construction

In other systems like c p m, you can really only see work flow within the sequence. It is very difficult to see logistical flow and nearly impossible to see trade flow. With tact system, we need to hold the line, keep the rhythm and be disciplined. Consistent and stable scheduling systems need to be supported by pre fabrication. When a project is entirely stick built, it will genera experience uncoordinated work issues with slow and unpredictable installation rates.